GAS TREATMENT AND TRANSPORTATION AT THE SATALANTEPA FIELD
Article Information
Abstract
This article reviews the proposed preliminary gas treatment unit
(PGTU) and export pipeline for the Satalantepa gas-condensate field in Uzbekistan.
Based on the project design document, it summarizes the feed-gas properties, process arrangement and hydraulic calculations for a 168 mm diameter, approximately
6 km pipeline. The proposed facility includes a vertical separator, gas metering, liquid degassing, produced-water handling and a flare. The design considers two operating cases and seasonal conditions. Reported gas velocities are 8.4–9.5 m/s, below the project criterion of 10 m/s, while the calculations indicate no hydrate formation under the analyzed conditions. The article interprets the project data and
identifies information that should be confirmed during detailed design.